Clear project scope
You know exactly what is included — and what is not — before anyone swings a hammer.
- We measure the space and photograph existing conditions before writing a single line of scope.
- Every proposal lists work by area and trade: demolition, framing, mechanical, finish, cleanup.
- Explicit exclusions are written down. If we're not moving the gas line, the proposal says so.
- Anything we can't verify until demo (subfloor, framing, water damage) is flagged in advance with a priced contingency instead of discovered as a surprise.

